This is an individual assignment. In this assignment, you will implement a task scheduler in Java
using heap-based priority queues.

Background

An embedded system is a computer system performing dedicated functions within a larger mechanical
or electrical system. Embedded systems range from portable devices such as Google Glasses, to large
stationary installations like traffic lights, factory controllers, and complex systems like hybrid
vehicles, and avionic.

Typically, the software of an embedded system consists of a set of tasks
(threads) with timing constraints. Typical timing constraints are release times and deadlines. A release
time specifies the earliest time a task can start, and a deadline is the latest time by which a task needs
to finish. One major goal of embedded system design is to find a feasible schedule for the task set
such that all the timing constraints are satisfied.

Task scheduler

We assume that the hardware platform of the target embedded systems is a single processor with m
identical cores, Core1, Core2, …, Corem. The task set V={v1, v2, …, vn} consists of n independent,
non-pre-emptible tasks.

A non-pre-emptible task cannot be pre-empted by another task during its
execution, i.e., it runs until it finishes. Each task vi (i=1, 2, …, n) has four attributes: a unique task
name vi
, an execution time ci
, a release time ri
, and a deadline di(di>ri).

All the execution times, the
release times and deadlines are non-negative integers. You need to design a task scheduler and
implement it in Java. Your task scheduler uses EDF (Earliest Deadline First) strategy to find a feasible
schedule for a task set. A schedule of a task set specifies when each task starts and on which core it is
executed. A feasible schedule is a schedule satisfying all the release time and deadline constraints.

The problem of finding a feasible schedule for this task scheduling problem is NP-complete. It is
widely believed that an NP-complete problem has no polynomial-time algorithm. However, nobody
can prove it.

First, we introduce two definitions: scheduling point and ready task.
 A scheduling point is a time point at which a task is scheduled on a core.
 A task vi (i=1, 2, ,,, n) is ready at a time t if tri holds.

The EDF scheduling strategy works as follows:
 At each scheduling point ti (titi+1, i=1, 2, …), among all the ready tasks, find a task with the
smallest deadline, and schedule it on an idle core such that its start time is minimized. Ties are
broken arbitrarily.

Since this task scheduling problem is NP-complete, the EDF strategy is used as a heuristic which is
not guaranteed to find a feasible schedule even if a feasible schedule exists.

Example One
Consider a set S1 of 6 independent tasks whose release times and deadlines are shown in Table 1. The
target processor has two identical cores. A feasible schedule of the task set by using EDF scheduling
strategy is shown in Figure 1.

Table 1: A set S1 of 6 tasks with individual release times and deadlines
Task Execution
time
Release time Deadline
v1 4 0 4
v2 4 1 5
v3 5 3 10
v4 6 4 11
v5 4 6 13
v6 5 6 18
Core1 v1 v3 v5
Core2 v2 v4 v6

Time 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Figure 1: A feasible schedule for S1

Example Two
Consider a set S2 of 6 independent tasks whose release times and deadlines are shown in Table 2. The
target processor has two identical cores. A schedule of the task set by using EDF scheduling strategy
is shown in Figure 2. As we can see, in the schedule, v6 finishes at time 16 and thus misses its
deadline. Therefore, the schedule is not feasible. However, a feasible schedule, as shown in Figure 3,
does exist.

Table 2: A set of tasks with individual release times and deadlines
Task Execution
time
Release time Deadline
v1 4 0 4
v2 4 1 5
v3 5 3 10
v4 6 4 11
v5 4 9 16
v6 5 10 15
Core1 v1 v3 v5
Core2 v2 v4 v6

Time 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Figure 2: An infeasible schedule constructed by the EDF scheduling strategy
Core1 v1 v3 v6
Core2 v2 v4 v5

Time 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Figure 2: A feasible schedule for S2

The TaskScheduler class

You need to write a task scheduler class named TaskScheduler. A template of the TaskScheduler
class is shown as follows.
public class TaskScheduler
{

static void scheduler(String file1, String file2, int m) {};

}
class ClassX {} /** Put all the additional classes you need here */

You can define any fields, constructors and methods within the TaskScheduler class. You can also
define additional classes. You must put all the additional classes in the file Taskscheduler,java.
The main method scheduler(String file1, String file2, int m) gets a task set from file1, constructs a
feasible schedule for the task set on a processor with m identical cores by using the EDF strategy, and
write the feasible schedule to file2. If no feasible schedule exists, it displays “ No feasible schedule
exists” on the screen.

Both file1 and file2 are text files. files1 contains a set of independent tasks each of which has a name,
an execution time, a release time and a deadline in that order. A task name is a string of letters and
numbers starting with a letter. Each of the execution times, release times and the deadlines is a string
of digits between 0 and 9. All the release times are non-negative integers, and all the execution times
and the deadlines are natural numbers. The format of file1 is as follows:
v1 c1 r1 d1 v2 c2 r2 d2 … vn cn rn dn

Two adjacent attributes (task name, execution time, release time and deadline) are separated by one or
more white space characters or a newline character. A sample file1 is shown here.

For simplicity, you may assume that all the task names in file1 are distinct.
This method needs to handle all the possible cases properly when reading from file1 and writing to
file2. All the possible cases are as follows:

1. file1 does not exist. In this case, print “file1 does not exist” and the program terminates.
2. file2 already exists. In this case, overwrite the old file2.

3. The task attributes (task name, release time and deadline) of file1 do not follow the formats
as shown before. In this case, print “input error when reading the attribute of the task X”
and the program terminates, where X is the name of the task with an incorrect attribute.
file2 has the following format:
v1 p1 t1 v2 p2
t2 … vn pn tn
where each vi(i=1, 2, …, n) is the task name, pi
is the name of the core where vi
is scheduled, and ti
is
the start time of the task vi
in the schedule. In file2, all the tasks must be sorted in non-decreasing
order of start times. A sample file2 is shown here.

Time complexity requirement

You need to include your time complexity analysis as comments in your program. The time
complexity of your scheduler is required to be no higher than O(n*log n), where n is the number of
tasks (Hints: use heap-based priority queues). You need to include the time complexity
analysis of your task scheduler in the TaskScheduler class file as comments. There is no specific
requirement on space complexity. However, try your best to make your program space efficient.
net.datastructures-4-0 package

You can use net.datastructures-4-0 where there is a heap-based priority queue class named
HeapPriorityQue.java. Read through its code and understand how it works.

Restrictions
All the other data structures and algorithms that are not in net.datastructures-4-0 must be
implemented in the TaskScheduler class. You are NOT allowed to use any sorting algorithms and
priority queues provided by Java.

How to submit your code?
Follow this link: https://cgi.cse.unsw.edu.au/~give/Student/give.php. Do the following:
1. Use your z-pass to log in.
2. Select current session, COMP9024 and assn3.
3. Submit TaskScheduler.java.

Marking
Marking is also based on the correctness and efficiency of your code. Your code must be well
commented.
The full mark of this assignment is 7 if the time complexity of your scheduler satisfies the abovementioned requirement. Otherwise, the full mark will be 0.
Deadline
The deadline is 11:59:59 pm, 14 May. No late submission will be accepted.